A substation feeder must be load-shed automatically when its measured loading surpasses the protective limit and no manual override has been authorised. Notwithstanding the seasonal adjustments published last winter, the protective limit currently enforced on this network is ninety percent of rated capacity. The northern feeder, which the control room had been monitoring since dawn, registered a measured loading of ninety-seven percent, and no manual override had been authorised by the duty engineer. The maintenance crew, whichever feeder ultimately requires attention, is dispatched from the regional depot at the edge of the catchment.
According to the passage, which statement is correct?